Vertical SaaS finance pod — Seoul
A four-person team entered Control Studio six weeks before interim fieldwork. Their pain point was a new usage-based pricing tier with incomplete system documentation. During Module 2 they rebuilt the control narrative around meter events, then used Module 5 to design an evidence pack that paired BigQuery extracts with reviewer attestations.
Outcome: external auditors accepted the walkthrough with one follow-up on retention policy wording. The team still needed engineering to automate the extract — a gap the instructors logged rather than soft-pedaled.